Contact Us
Latest News

Thomas Dudley’s upgraded Kunkel Wagner line offers new production capabilities

Posted on April 26, 2017 by Thomas Dudley Ltd

Thomas Dudley’s award-winning foundry division has upgraded its Kunkel Wagner line at its Duport Foundry, offering new production capabilities.

The upgrade to this facility increases flexibility and provides the capacity to manufacture 120 boxes per hour. Castings can also be made in all grades of grey/ductile/ADI incorporating both shell and cold box cores.

The KW line modernisation is part of an ongoing development and improvement programme that has been implemented since Thomas Dudley acquired the West Midlands foundry in 2014. All electronics have now been upgraded to Siemens 7 and new hydraulics supply and moulding infrastructure have been installed.

Mick Cramphorn, Foundry Director said: “Our commitment to investing in technology remains at its strongest ever. We thrive on continuous improvement to enhance our world-class engineering capabilities. With that said, we can now offer even higher quality castings with increased output speed and capacity to meet the most demanding deadlines. We provide reassurance of supply through exceptional reliability whilst designing and manufacturing tooling and cores in-house quicker than any other European foundry.”

The upgrade further enhances the business benefits delivered to customers with improved quality, even shorter lead times and greater cost effectiveness. The Thomas Dudley (Duport) site is located a short distance from the company’s head office based in Dudley, and specialises in manufacturing grey and ductile iron castings up to 90Kg in weight. For any other information or enquiries, email foundrysales@thomasdudley.co.uk, Tel: +44 (0) 121 530 7000 or visit www.thomasdudleycastings.co.uk.

Posted in :

Latest News From Around Thomas Dudley

August 26, 2026
Thomas Dudley Tender Opportunity - Vertical Machining Centre Replacement

Tender Opportunity – Vertical Machining Centre Replacement Thomas Dudley Plastics is investing in new energy efficient CNC machinery to reduce energy consumption and operating costs. This includes the replacement of two ageing vertical machining centres in the Toolroom with new equipment to improve production efficiency. The existing machines listed below are provided as a guide […]

August 26, 2026
Thomas Dudley Tender Opportunity - Site-Wide LED Lighting Replacement

Tender Opportunity – Site-Wide LED Lighting Replacement Thomas Dudley Plastics is investing in energy efficient LED lighting to reduce energy consumption and operating costs. This includes the replacement of the existing lighting across our entire site with modern LED equivalents to improve efficiency, light quality and reliability. The scope outlined below is provided as a […]

August 26, 2026
Thomas Dudley Tender Opportunity - Air Testing

Tender Opportunity – Air Testing System Thomas Dudley Plastics is investing in a new air testing system to improve product testing. This includes replacing our existing hydro flow testing with modern air testing equipment that increases output, eliminates the use of water and improves the detection of failures. The existing testing method described below is […]

July 15, 2026
HRH The Duke of Gloucester visits Thomas Dudley

HRH The Duke of Gloucester Visits Thomas Dudley’s Offices and Manufacturing Centre Dudley, UK - Thomas Dudley was honoured to welcome His Royal Highness The Duke of Gloucester to its offices and Manufacturing Centre in Dudley, marking a memorable occasion for the business and its employees. During his visit, The Duke enjoyed a comprehensive tour […]

Inspiring people into manufacturing
Thomas Dudley Limited
Registered in England No. 02399487
Registered Office: 295 Birmingham New Road,
Dudley, West Midlands, DY1 4SJ

Thomas Dudley Limited
Registered in England No. 02399487
Registered Office: 295 Birmingham New Road,
Dudley, West Midlands, DY1 4SJ
Thomas Dudley Ltd | Copyright 2021